Authorities in Mumbai and Gurugram are using advanced engineering methods to reduce city traffic and increase travel speeds.
孟買與古魯格蘭的當局正利用先進的工程方法,以減少城市交通擁堵並提高行車速度。
Main Body
In Mumbai, the Western Railway (WR) has been allowed to study whether a tunnel rail link between Churchgate and Mumbai Central is possible. This plan is necessary because buying land is too expensive and the city is too crowded to expand tracks on the surface. Although building tunnels costs about ₹1,100 crore per kilometer—four times more than elevated tracks—this method allows suburban trains to be separated from long-distance and freight trains. This project might extend to Prabhadevi and is being considered as an alternative to the delayed sixth line. Meanwhile, the Central Railway is looking at similar tunnel options for the Parel-CSMT area. Furthermore, the main route between Mumbai, Ahmedabad, and Delhi is being upgraded to 160 kmph. Because the construction is mostly finished and the Kavach signaling system is almost ready, travel time between Mumbai and Delhi is expected to drop to 12 hours by 2027.
在孟買,西鐵(WR)獲准研究在 Churchgate 與孟買中央車站之間建設隧道鐵路連結是否可行。這項計劃十分必要,因為購地成本過高,且城市過於擁擠,無法在地面擴建軌道。儘管建設隧道的成本每公里約 1,100 億盧比——是高架軌道的四倍——但此方法能將郊區列車與長途及貨運列車分開。此項目可能會延伸至 Prabhadevi,並被視為延遲的第六條線之替代方案。與此同時,中鐵也在考慮 Parel-CSMT 地區的類似隧道選項。此外,孟買、艾哈邁達巴德與德理之間的主線正升級至時速 160 公里。由於建設已基本完成,Kavach 信號系統也幾近就緒,預計到 2027 年,孟買與德理之間的行車時間將縮短至 12 小時。
At the same time, the Gurugram Metro Rail Limited (GMRL) is moving forward with the second phase of its project by building integrated double-decker structures. Specifically, at Krishna Chowk and Old Delhi Road, these designs use single pillars to support both a metro track and a road above it. The updated contract, valued at ₹1,409 crore, is currently waiting for approval from the World Bank. This plan includes ₹200 crore for these specific civil works. Additionally, a similar design has been proposed for the section between Ghata and Vatika Chowk to help the Haryana Mass Rapid Transport Corporation Limited.
與此同時,古魯格蘭地鐵有限公司(GMRL)正透過建設綜合雙層結構,推進其項目的第二階段。具體而言,在 Krishna Chowk 與 Old Delhi Road,這些設計使用單一支柱來同時支撐地鐵軌道及其上方的道路。更新後的合約價值 1,409 億盧比,目前正等待世界銀行批准。該計劃包括 2 億盧比用於這些特定的土木工程。此外,在 Ghata 與 Vatika Chowk 之間的路段也提出了類似設計,以協助哈里亞納邦快速交通公司。
Conclusion
Both cities are moving toward underground and multi-level transport systems to solve the problem of limited space on the ground.
這兩座城市正趨向於地下與多層交通系統,以解決地面空間有限的問題。
Vocabulary Learning
🚀 Breaking the 'Simple Sentence' Habit
An A2 student usually writes like this: "The city is crowded. Land is expensive. They will build a tunnel."
To reach B2, you must stop using short, choppy sentences and start using Complex Logical Connectors. This allows you to explain why things happen in a single, sophisticated flow.
🔍 The 'B2 Logic' Bridge
Look at how the article connects a problem to a solution using "Because" and "Although":
*"Although building tunnels costs... four times more than elevated tracks—this method allows suburban trains to be separated..."
The B2 Secret: The author acknowledges a negative (high cost) but immediately pivots to a positive (better separation). This is called Concession.
🛠️ Upgrade Your Vocabulary (A2 B2)
Instead of using basic words, try these 'precision' verbs found in the text:
| A2 Word (Basic) | B2 Word (Precise) | Usage in Context |
|---|---|---|
| Help | Reduce/Increase | Reduce traffic / Increase speed |
| Do/Make | Implement/Upgrade | Upgrade the route to 160 kmph |
| Look at | Consider/Study | Study whether a link is possible |
💡 Pro Tip: The 'Passive' Shift
Notice the phrase: "is being considered as an alternative."
At A2, you say: "They are considering it." At B2, you focus on the action, not the person. Using "is being [verb]ed" makes your English sound professional, academic, and objective. This is the hallmark of upper-intermediate fluency.